The Timeline and Steps in Tampa, FL Roof Replacement
General Timeline
A standard residential asphalt shingle roof replacement usually takes between one and three days of on-site work once the crew arrives. However, the full process, from initial inspection through final inspection and cleanup, typically takes two to six weeks, with most of that time consumed by scheduling, permits, and material ordering.Pre-Installation Phases
The process begins with an inspection and an estimate, which usually takes a week or two as we measure the roof, assess the weather and property conditions and what it will take to get it done, and deliver your quote. Naturally, you'll want time to evaluate that before signing the contract. Once you do, you'll put down a deposit, and we'll be able to order materials.While we wait for those materials, we pull the required municipal permits, and this stage commonly takes several days to two weeks. The materials and a dumpster should all be delivered one to three days before the work actually starts, and the weather will be a factor in that, as well.
Your Prep
Before we start, you'll need to clear away any vehicles, protect or remove any outdoor items within roughly 15 feet of the house, and take down any interior wall decorations that vibration could dislodge. You may also want to arrange for your pets and children to be somewhere else for the day, depending on their temperment.On-Site Steps
Our crews will arrive early to maximize daylight, and on the first day, we'll place tarps over the landscaping and against the siding and then strip the old shingles, underlayment, and flashing down to the bare decking using pry bars and shovels. We'll load all the debris into the dumpster. The exposed deck is then inspected and any soft or compromised plywood is replaced.Then, we install an ice-and-water shield at the eaves, valleys, and penetrations, along with drip edge and partial underlayment. On the second day, we complete the installation, including laying out the field shingles from the bottom upward according to manufacturer specifications. Flashing gets installed around chimneys, vents, skylights, and wall intersections, and ridge vents and ridge-cap shingles finish the system.
What It's Like
Nail guns and compressors will be running throughout this process, producing moderate-to-loud noise, and a standard roof is often done by the end of the second day. If needed, the third day will be for finishing up details, followed by a thorough cleanup that includes magnetic nail sweeps of the yard and driveway, gutter clearing, the removal of all tarps and equipment, and dumpster hauling. Then we'll walk through it all with you before we leave.If your roof is ready for a refresh, call us at Revive My Roof in Tampa and Jacksonville, FL for a free quote. We can also evaluate whether your roof can be rejuvenated rather than replaced with an eco-friendly and water-safe technology that restores your roof's vitality.